Wednesday, 24 April 2019
khabarexpress:Local to Global NEWS
  1794 view   Add Comment

CLW, DLW, RCF & RWF Exceed Production Target During April-October 2007

Chitranjan Locomotive Works produced 97 electric locomotives against the target of 94 electronic locomotives and Diesel Locomotive Works produced 137 diesel locomotives against the target of...

Chitranjan Locomotive Works  produced 97 electric locomotives against the target of 94 electronic locomotives and Diesel Locomotive Works produced 137 diesel locomotives against the target of 127 diesel locomotives during first seven months of the fiscal 2007-08. Rail Coach Factory  produced 783 coaches against the target of 778 coaches where as Integral Coach Factory  produced 668 coaches against the target of 682 coaches during the same period. Rail Wheel Factory  produced 73755 wheels and 22336 axles against the target of 73072 wheels and 22335 axles during April-October 2007.
During the month of October 2007, CLW, DLW, ICF, RCF and RWF have produced 18 electric locomotives, 19 diesel locomotive, 118 coaches, 136 coaches, 11083 wheels and 2001 axles respectively against the target of 18 electric locomotives, 18 diesel locomotive, 130 coaches, 133 coaches, 10400 wheels and 2000 axels. Except ICF, all other units have exceeded or attain the target.
The punctuality percentage of mail/express trains was 92.8 per cent in Broad Gauge and 99.5 per cent in Metre Gauge during the month of October 2007 compared to 92.4 per cent and 99.3 per cent respectively during the same period last year.
Railways have realized an amount of Rs. 21 crore approximately during the month of October 2007 through ticket checking.

Share this news

Post your comment